TrolleyVW
06-08-2014, 06:32 PM
I've read the Poor Beading From DP paint coating (http://www.autogeekonline.net/forum/dp/71988-poor-beading-dp-paint-coating.html) thread and it was stated that a member applied 2 coats 24 hours apart.
If the paint is prepped properly with the DP coating Prep Polish and the coating is applied, left for 24-48 hours in the elements (water and pollen), not washed or touched at all by hand or product, and then I want to apply another coat, is there an issue potentially with bonding? Is there even a benefit to doing so? And if there may/may not be a benefit, would "cleaning" the relatively fresh coating with DP Prep Polish have any effect, positive or negative?
If the paint is prepped properly with the DP coating Prep Polish and the coating is applied, left for 24-48 hours in the elements (water and pollen), not washed or touched at all by hand or product, and then I want to apply another coat, is there an issue potentially with bonding? Is there even a benefit to doing so? And if there may/may not be a benefit, would "cleaning" the relatively fresh coating with DP Prep Polish have any effect, positive or negative?