Hey everybody. Been absent here for the past month or so. My family and I purchased a 6 acre property and closed on June 30th. Since then we have been going non stop getting the house, shop renovations completed. As of now I'm going to start moving my equipment in tomorrow.
Before we moved in
https://i.imgur.com/ZJlQMJs.jpg
https://i.imgur.com/EzIV0cB.jpg
https://i.imgur.com/2TjF4JO.jpg
So the 40x60 Morton building is now divided into two sides. Each roughly 40x30. My shop on one side and the other is my wifes barn stalls for our horses.
In order to get my shop going we first had to remove 40+ yards of fill to prep for a 6in concrete slab. First we started by digging down and sinking 2 55 gal drums for my drain/dry well setup.
https://i.imgur.com/pGhSR1N.jpg
https://i.imgur.com/qjnXKL3.jpg
https://i.imgur.com/oxeuUdd.jpg
Once that was done. We removed the rest of the fill, checking grade as we went. We also built in a grade to pitch towards the drain. Once finished we compacted, laid down a vapor barrier and had the slab poured.
https://i.imgur.com/ZkZwzsA.jpg
https://i.imgur.com/TWhWQ3j.jpg
https://i.imgur.com/tr0Idzx.jpg
https://i.imgur.com/tNE4aPk.jpg
https://i.imgur.com/k6I3zXE.jpg
Next was a dividing wall framed with 2x6s
https://i.imgur.com/ULjftRQ.jpg
https://i.imgur.com/NyNe9pZ.jpg
My brother in law handle all the electrical work. 10 4 gang boxes and 6 high bay LED UFO lights. I also pressure washed all the walls to remove years of dust and dirt.
Lights off vs lights on
https://i.imgur.com/nRpejp6.jpg
https://i.imgur.com/s06Tlve.jpg
Gave one of my cars the first bath
https://i.imgur.com/MoHN2LW.jpg
https://i.imgur.com/ORd88Gz.jpg
https://i.imgur.com/0OL5Hor.jpg
https://i.imgur.com/qTzH14N.jpg
https://i.imgur.com/BF8hQ6h.jpg
And one of our horses looking for treats lol
https://i.imgur.com/gJg5LTB.jpg
Before we moved in
https://i.imgur.com/ZJlQMJs.jpg
https://i.imgur.com/EzIV0cB.jpg
https://i.imgur.com/2TjF4JO.jpg
So the 40x60 Morton building is now divided into two sides. Each roughly 40x30. My shop on one side and the other is my wifes barn stalls for our horses.
In order to get my shop going we first had to remove 40+ yards of fill to prep for a 6in concrete slab. First we started by digging down and sinking 2 55 gal drums for my drain/dry well setup.
https://i.imgur.com/pGhSR1N.jpg
https://i.imgur.com/qjnXKL3.jpg
https://i.imgur.com/oxeuUdd.jpg
Once that was done. We removed the rest of the fill, checking grade as we went. We also built in a grade to pitch towards the drain. Once finished we compacted, laid down a vapor barrier and had the slab poured.
https://i.imgur.com/ZkZwzsA.jpg
https://i.imgur.com/TWhWQ3j.jpg
https://i.imgur.com/tr0Idzx.jpg
https://i.imgur.com/tNE4aPk.jpg
https://i.imgur.com/k6I3zXE.jpg
Next was a dividing wall framed with 2x6s
https://i.imgur.com/ULjftRQ.jpg
https://i.imgur.com/NyNe9pZ.jpg
My brother in law handle all the electrical work. 10 4 gang boxes and 6 high bay LED UFO lights. I also pressure washed all the walls to remove years of dust and dirt.
Lights off vs lights on
https://i.imgur.com/nRpejp6.jpg
https://i.imgur.com/s06Tlve.jpg
Gave one of my cars the first bath
https://i.imgur.com/MoHN2LW.jpg
https://i.imgur.com/ORd88Gz.jpg
https://i.imgur.com/0OL5Hor.jpg
https://i.imgur.com/qTzH14N.jpg
https://i.imgur.com/BF8hQ6h.jpg
And one of our horses looking for treats lol
https://i.imgur.com/gJg5LTB.jpg